Metal spacers L100-600mm

from 3.50 to 9.20 MDL

Wholesale price upon requestContact us
Material rolled steel
Lenght from 100 to 600мм
Width 20mm
Thickness 2mm
Tensile strength 70kg/mm2
Packing cardboard box 100pcs

The spacers for lightweight timber formwork are made of drawn steel, with rounded edges. The spacers are not joined or cut, each with a tensile strength of over 70 kg / mm2.

The sizes of the spacers vary from 10 cm to 100 cm in length with a step of 5 cm, depending on the size of the wall to be poured.

Their use contributes to high productivity in construction and repair.

The spacers are "disposable", since after reinforcement and pouring the wall, they remain inside it.

The spacers are packaged in cardboard boxes of 100 pieces each.

 

Accessories for metal spacers:

•  U-shaped profile L500mm

•  U-shaped profile 60x1200mm; 

•  U-shaped profile 80x1200mm; 

•  Wedge for spacers.

OPTIONS
Code Name Length (mm) Width (mm) Weight (kg) Price MDL Price MDL Packing 100 pcs.
00000801 Metal spacers L 100 100 20 0,06 3.50 350
00000802 Metal spacers L 150 150 20 0,07 3.80 380
00000803 Metal spacers L 200 200 20 0,08 4.40 440
00000804 Metal spacers L 250 250 20 0,09 5.00 500
00000805 Metal spacers L 300 300 20 0,10 5.50 550
00002518 Metal spacers L 350 350 20 0,11 6.40 640
00000806 Metal spacers L 400 400 20 0,12 6.80 680
00000807 Metal spacers L 500 500 20 0,15 8.00 800
00002186 Metal spacers L 600 600 20 0,18 9.20 920

 

Material: rolled steel

Available sizes: from 100 to 1000 mm

Thickness: 2 mm

Tensile strength: 70 kg / mm2

Application: for reinforcing wooden formwork

Packaging - cardboard box 100 pcs.

METAL SPACERS FOR LIGHT WOODEN FORMWORK

  • When constructing formwork, it is necessary to use spacers from the same manufacturer.
  • Before pouring concrete, it is necessary to carefully check their correct connection with wedges and clamps.
  • Do not use formwork of different lengths to ensure equal strength over the entire area.
  • To install the correct number of spacers, it is necessary to follow the manufacturer's instructions to ensure high-quality concrete pouring.
  • Concrete pouring should be slow, especially at the base of the formwork, the maximum vertical pouring speed should not exceed 2.5 m / h
Related products
U-shaped profile 60x1200mm
150 MDL
Details
U-shaped profile 80x1200mm
150 MDL
Details
U-shaped profile L500mm
53 MDL
Details
Wedge for spacers
7 MDL
Details
© LIDER Company. 1997–2025. All rights reserved.